Optimization of testing station

CommScope is a telecommunication company and a recognized global leader. As part of its production processes, it tests its products at specialized workplaces, where insufficient capacity, ergonomics and service life of the test tool are often a problem.

Thanks to our experience with production processes, construction, electronics and software development, we were able to meet the set goals in the form of test site optimization.

Our task was to optimize cable testing and deliver a solution that will increase testing capacity, test tool life and workplace ergonomics. The solution was to design the test tool so that contact does not break out during daily use. We also modified the design of PCB boards, including software, and thus doubled the number of inputs for testing. We have also added a guide segment for easier connection. Connecting the connectors with clamps ensures a firm and stable connection and at the same time grounds the connector body.